    Foam Kid Fire Fighting Pipe Line-Qatif

    Foam Kid Fire Fighting Pipe Line-Qatif

    • Client
      MultiLines Construction And Technical Services
    • Duration
      3months
    • Location
      Qatif
    • Value
      650,000.00 SR
    • Year Completed
      2010
     
    BULK PLANT-testing and commissioning of gt3 substation electrical equipment’s in hawiay gas plant.
    Includes testing and commissioning of 13.8 kv mv metal glad double-ended switchgears, 4.16 kv mv motor control centers, 480 volts lvmetal clad double-ended switchgears, and power transformer.
     
    gaz plan